Long leads cable tv
List long leads cable tv
-
They may also be used to extend an existing rf aerial cablethese aerial fly leads are used for connecting tvs, vcrs, sky and similar devices togetherthese cables are rohs
2 €
-
Psx rgb scart av cable tv scart cable lead for playstation 1,2it’s not coming with box it’s coming in a jiffy bagcondition is newdispatched with royal mail 2 class
11 €
-
For virgin media tvcable tv media box, cisco ct , with 500gb hard drivenew still in packagingcan be delivered for cost of petrol collection is welcomejust phone me to arrange jayyou can inspect before you decide to buy
18 €
-
New 5m long extension cable lead cord for amazon echo dot 3rd generation if you need to power your amazon echo dot in an out of the way place, or you're short of power sockets, this is idealthis brand new 5m extension cable for your ac adaptor / power supply which has a dc plug size of 4new, never usedone side is the socket 4mm x 1the total length of this extension is 5 metrescan be use with any voltage adaptor up to 24v7mm and the other side is the connect 4mm x 1in excellent condition
9 €
-
Cisco ct cable tv media box, 500gb hard drivenew still in packagingcan be delivered for cost of petrol collection is welcomejust phone me to arrange jayyou can inspect before you decide to buy
19 €
-
Crimp tool used for installing satelite and cable tv vitelec ccc is a coaxial termination crimp tool for type bnc, tnc, twinax connectors, rgcollection from hanwell w7 near west ealingif item is still listed here, item is still for salehex-crimp 8,23 and " and
4 €
-
Rca to av audio video cable tv scart lead for playstation ps1 ps2 ps3 adapterdispatched with royal mail 1st class large lettercondition is new
-
Av rca audio video cable tv lead for super nintendo snes n gamecube consoledispatched with royal mail 2nd class large lettercondition is new
1 €
-
0m rca to av audio video wire cable tv lead for sony playstation ps1 ps2 ps3dispatched with royal mail 1st class large lettercondition is new
3 €
-
Nintendo wii official genuine original av cable tv lead rvl-009dispatched fast & free from u
7 €
-
2 metre long cablemhl micro usb to hdmi p hdtv 2 metre long adapter cable with integrated usb charging cableusb cable to connect to a power supply to charge the device while connected to the tvmhl micro usb to hdmi cable (brand new) mirror the screen from a smartphone or tablet to view on a hdmi tv2 (not suitable for tab 3 7mirror your mhl phone or tablet screen through the standard hdmi input on a hdtv0, tab , tab pro, galaxy note 8, note pro 12supports p full hd video resolutions, video resolution: 480i, 480p, 720i, 720p, i, p (xhz) can be posted if paid with paypal1) note: compatible with all samsung 11-pin micro usb interface devices including samsung galaxy, note, tab and any other smartphone or tablet with the same micro usb phone connectionsplug and play, no driver requiredworks with samsung galaxy s5, s4, s3, note 3, note 2, galaxy tab 3 8
102 €
-
And an extra long 6m cable capable of reaching across the room (themthe closed design of the hama hk- headphones eliminate external disturbances to ensure that you can enjoy music or tv audio in uninterrupted comfort
9 €
-
Vs-maxx texas hold-em tv poker edition unit plug 'n' play video game handsets each have approx 1requires 4 aa batteries for consoleuser guide includedconsole has approx 2cash-on-collection read morenew but box shows minor damage from being stored in cupboard for a while
17 €
-
Car booster cable jump leads cable clamp opening: 25mm maximum2 metre cable lengthsimilar to ones sold in halfords for a tennerinsulated colour coded clamp handlesextra thick colour coded insulation for added strength and durability
5 €
-
High quality stereo headphones that feature an extra long, single-sided cable that is specially designed for connecting to tvs and hi-fi systems35mm stereo adaptorsupplied with 3adjustable padded headband for extra comfort
13 €
-
This is a super performance cable and wise investment for av enthusiasts who need a high quality long length cableqed 7m high performance qunex hdmi cable what hifi 5star award winnerselling due to change of layout of home cinema
10 €
-
52" samsung full hd tv, comes with wall mount, long hdmi cable and remotedoes not come with a tv stand or boxselling because it is too large for our new flat
150 €
-
15m long coaxial cable kit with accessories1 x 15m of cable white2 x coaxial plugs1 x back to back coax connector
4 €
-
Samsung smart 22inch p hd led internet tvincludes: original box samsung smart controller inbuilt stereo speakers ir input extender instruction manuals 1m long power cable samsung smart software for apps including: netflix bbc iplayer google and many morecondition is usedfew nicks and scratches but unnoticeable once screen is turned on
72 €
-
This tv cable is constructed of coax cable with male to male connectorsthe coupler could als be used to join the cable to en existing cable to form an extensionit is supplied with a gender changer / coupler to suit any situation where a male to female cable is required
13 €
-
Switch power extension cable ns charging extension cable tv base data transmission extension cable3; it can also be used as an extension cable for data, video and transmission of switch tv base dock
5 €
-
Includes control, power cable, tv cable and hdmi cablemanhattan t3-r hdr 4k ultra hd smart freeview play tv recorder 500gbpreowned and in good working conditionin decent all round condition
136 €
-
New in box twin tuner satellite and cable combo tv receiver linux operating system this box requires cable internet to use asian movies sports news kids 12 months cable tv warranty price 120 all set up any questions please ask nb free ads policies this listing is only for free to air and does not contravene your policies in anyway please do not remove thank you
120 €
-
Check out my other items read morehere we have a bag full of approx 22 cables, leads, connectors, they could be for cameras, printers, pc etc as per photos, used
15 €
-
3x xlr to xlr 3x jack to xlr long leads brand new cash on collection onlythanks for looking
10 €
-
This xbox classic component av cable has five connectors in end that you use with a standard-definition tv or monitorthe other end of the cable has an audio-visual (av) connector that you connect to the xbox console
4 €
-
Grundy vontar v9s tv satellite receiver ntl-pace d14doin vintage cable tv boxhas a card inside ntl home virgin media cable box thomson skybox digibox satellite receiverplease make me an offerideally pick up only or buyer to pay for post and packaging via paypalcan be sold separatelyntl remote controls sky remote controls been stored for a while and not been testedpart of in-laws house clearance
10 €
-
Stylish and comfortable stereo headphones with an over-ear design and extra long, single-sided cable; ideal for connecting to tvs and hi-fi systemsduring that process you will be issued with an rma number
14 €
-
Box requires live virgin broadband or tv connectionif you previously had a satellite box this is the cable versionbox is fully updated with sports, movies, entertainment, kids and many morefor more info or questions message me for fast reply
160 €